- 01535 652338
- mail@watsonsbs.com
Whetley Medical Centre Heating Upgrade
Watsons Building Services was entrusted with a project to design and install a replacement heating system as part of a refurbishment for the Whetley Medical Centre in Bradford. The medical centre comprises clinical and administration spaces across two stories. The project was strategically executed in phases to minimise disruptions during the winter months, ensuring the continued operation of the centre.
The centre's two existing air-to-water air source heat pumps (ASHP) and associated plants were utilised and reused. The existing distribution pipework and heat emitters were stripped out and replaced with new pipework and radiators sized with a flow temperature of 55°C ensuring the building could be adequately heated by the low temperature ASHPs.
Project Scope
Below is a non-exhaustive list of services installed in full coordination with other contractors.
- Exisitng air source heat pumps were reused as part of a new ASHP system
- Replaced pipework and heat emitters with low-temperature components
- Ensured a flow temperature of 55°C to adequately heat the building
- BMS system installed
Latest Projects
-
01 January 2024
Building Services for a Sixth Form Centre
-
-
10 January 2023
Mechanical Services for a Distribution Centre.